Building material for the construction of Luang Phor Phratokotama

Breite9Meter height 16Meter (statue only)

Steel 16mm. 100Stück
Steel 12mm. 150Stück
Steel 6mm. 20
Drahtbuendel25buendel
Brick 1,000Stück
Steine60Kubik
Sand60Kubik
Portland Zement(Chang Daeng) 500Säcke
Mischzement5saecke
Wood Dicke3Länge4Meter 200Stück
Sperrholz100mm. QualitätA 25Bretter
Nägel3 1Kiste
Nägel4 1Kiste
Nägel1. 5 5Kilogramm
Lehm20Kilogramm
New engine oil 20Liter
Diesel10Liter
Gefaess200liter38stueck
Kabelbinder1Duzend
Hammer8stueck
Sicherheitshandschuhe5Kartons
Aluminiumblech5stueck
Hammer8stueck
Spachtel10stueck
SchraubenNr. 21Länge3Zoll
with Muttern300Stück
Bohrer3stueck
Bohreinsatz6mm.
Fabric gloves, cement bucket, ropes

Total sum of Baumaterial1, 000, 000Baht
Administrative costs in the amount of von300, 000Baht
Contact person: Phra Paladsacha Sutuchituto Tel. 082-865-9442,090-3453055

 

Width of 3.60 m

Steel 12mm. leicht25Stück
Steel 9mm. 25Stück
Steel 6mm. 5Stück
DrahtbündelStahl 10Bündel
Portland Zement(Chang Daeng) 130Säcke
Mischzement2saecke
Blockziegel600stueck
Steine15Kubik
Sand15Kubik
Sperrholz3Bretter
SicherheitshandschuheNr.M 1Karton
Lehm5Kilogramm
New Motoröl5Liter
3 liter diesel
Behälter200Liter 6Stück
Scaffolding, cement tanks, ropes

Total for Baumaterial150, 000Baht
Administrative costs in the amount of von70, 000Baht
Contact person: Phra Ayan Udom Chantasilo
(Pu PhunkhamPiangdin) Tel. 090-745-3031

 

Width 2 m

Steel 12mm. 10 pieces
Steel 9mm. 10 pieces
Steel 6mm. 5Stück
Steel 2Bündel wire bundle
Portland Zement(Chang Daeng) 50Säcke
Steine10Kubik
Blockziegel250stueck
Sand10Kubik
Sperrholz10mm. QualitätA 2Bretter
New engine oil

Lehm3Kilogramm
SicherheitshandschuheNr.M 1Karton

Building materials worth a total von25, 000Baht
Administrative costs in the amount of 15, 000Baht
Contact person: Phra AB SomchaiParipunno
(Khru BA Chao Kukham)Tel. 087-999-3360

 

Width 1.20 m

Stahl6mm5stueck
Steel 1Bündel wire bundle
Portland Zement(Chang Daeng) 10Säcke
Mischzement1Sack
Stone 2Kubik
Sand 2Kubik
Blockziegel50stueck
Sperrholz10mm. QualitätA 1Blätter
New engine oil
Clay

Building materials worth a total of 3, 000Baht
Administrative expenses amounting to by7, 000Baht
KontaktpersonPhra AB Khwanpanet SiriphattoTel. 084-743-6784

 

Width 4 m

Steel 12mm. 10 pieces
Steel 9mm. 10 pieces
Portland Zement(Chang Daeng) 25Säcke
Stone 5Kubik
Sand 5Kubik
Steel 2Bündel wire bundle
Engine oil 5
Diesel3Liter
Lehm5Kilogramm

Construction material with a total value of 15, 000Baht
Administrative costs in the amount of von25, 000Baht
KontaktpersonPhra Ayan Uthai Thipwangso Tel. 087-946-9987

Width of 3.60 metres, height 5 m

Steel 4Hun (old chin = Hun. () Bambusschutz50Stück of unit of measure
Steel 3Hun30Stück
Steel 2Hun200Stück
Block Zement50cmBlock
Steel 10Bündel wire bundle
Portland Zement(Chang Daeng) 100Säcke
Mischzement10saecke
Blockziegel300stueck
Stone 15Kubik
Sand 15Kubik
Engine oil 5
Diesel3Liter
Lehm5Kilogramm

 

Building materials worth a total von100, 000Baht
Administrative costs in the amount of von50, 000Baht
KontaktpersonPhra Ayan Sanan Thammathiro Tel. 087-253-9520